Production line configuration

Power & Building Cable Production Line

Configure conductor preparation, insulation, multi-core laying-up and sheathing around the cable sizes and constructions you plan to produce.

Explore the production route
Power & Building Cable illustration
Power & Building CableApplication illustration

Define the cable you want to produce

Conductor material, cross-section, core count, insulation and sheath materials, finished diameter and intended output.

Conductor → core insulation → laying-up where required → sheath → finishing

Indicative process route; confirm against your cable drawing.

Selection priority

Cross-section, core count and insulation

Choose where your production begins

Building wire and multi-core power cable do not share one fixed equipment list. Select the material you will buy, then add only the operations required by the cable drawing.

Catalogue power-cable extrusion equipment
Catalogue power-cable extrusion equipmentInsulation and sheath-stage context; additional layers and assembly follow the cable drawing.
Compare the equipment boundary

Buy conductor ready for insulation

  1. Insulate
  2. Assemble if required
  3. Specified layers
  4. Finish

Core insulation → laying-up where required → specified additional layers → sheath and finishing.

Supply boundary & incoming-material checks
Outside or separately confirmed
Drawing and conductor stranding can sit outside the purchase.
Check the incoming material
Solid or stranded construction, material, dimensions, wire condition and loading reels.

This defines a discussion scope. The final equipment list follows the cable drawing and technical review.

Explore the production route

Select a stage to see its role, equipment and the interface to confirm.

Multi-wire drawing with online annealing
Power & Building Cable

Conductor preparation

Prepare the conductor dimensions and condition needed by the next operation.

Input
Specified rod or incoming wire
Output
Wire at the specified diameter

Confirm the interfaceMaterial compatibility, incoming and finished diameter, annealing needs and supply reels.

Review wire drawing & annealing equipment
Stage 1 of 5

Compare the construction choices

A different cable structure can change machines, tooling and supply responsibilities. Compare these choices before agreeing the equipment list.

Catalogue power-cable extrusion equipment
Catalogue power-cable extrusion equipmentInsulation-stage review context; select the tooling and operating range for the building wire.

Single-core building wire

Review conductor preparation, insulation, inspection and the required reel or coil package.

What changes

A single-core product does not automatically need a laying-up stage or a separate sheath.

Confirm before selection

Specify the exact construction and final package, including whether additional layers are present.

Explore the equipment for this cable

Open an equipment family to compare machine types and reference specifications.

Agree the output, site and acceptance basis

A connected line needs a common specification at every handover. Use these points to test whether the proposed scope is complete.

Production target

Capacity for the product mix

A multi-core product needs the correct quantity of every insulated core before assembly can proceed.

Review the planning details

Plan conductor and insulation output against the finished cable mix, including color changes, reel transfers and the change between single- and multi-core work.

Factory interfaces

Heavy reel movement

Use loaded reel dimensions and weights to review loading equipment, access routes, intermediate storage and floor conditions.

Review the planning details

Obtain machine footprints and service-clearance requirements before committing to the final factory layout.

Acceptance plan

Trial and acceptance

Specify representative cable constructions and materials, including the largest handling case and the smallest planned product.

Review the planning details

Agree conductor, layer and finished-cable checks, with any specialist treatment or armor assessed under its own scope.

Put responsibilities in writing

Identify who provides trial materials, utilities, reels, testing and any external process. Agree how results will be recorded and what must be resolved before acceptance.

Compare investment on the same scope

A useful budget separates the machines from plant preparation, external processing and start-up requirements. No standard package price can replace a defined cable specification.

Configuration and purchasing choices that change the budget
DecisionWhat enters the scopeHow to compare
Construction and material rangeConductor preparation, core insulation, cabling and the defined extrusion material systems.Do not compare a building-wire scope with a multi-core power-cable scope by total price alone.
Reels and specialist layersPay-off and take-up loading, lifting interfaces, fillers, tapes and separate armoring or treatment.List the included reels, handling equipment and each specialist operation.
Phased purchaseA defined single-core range or purchased insulated cores can be considered as a first stage.Check future cabling space, reel logistics and whether existing extrusion equipment can process the later assembly.
Catalogue power-cable extrusion equipment
Catalogue power-cable extrusion equipment

Use the catalogue as a starting point

The catalogue identifies power-cable insulation and sheathing as a dedicated extrusion family. Its reference configurations are distinct from the new-energy family.

Select against the actual input diameter, finished diameter, compound and handling range. The illustration does not prove a complete armored or specialist-treated cable package.

Prepare your line-planning requirements

Building wire or multi-core cable

The product determines whether a cabling or laying-up stage is required.

Conductor construction

Material, flexibility and strand structure affect conductor preparation.

Insulation & outer layers

List each layer, its material and thickness in the proposed cable design.

Reels & factory handling

Large reels and intermediate storage need to be included in layout planning.

Application questions

Can we start with building wire and expand later?

Share the planned product roadmap. The initial equipment and future interfaces can be discussed together, while confirming what expansion would actually require.

Are armored constructions covered automatically?

No. Additional layers or processes must be explicitly included in the cable specification and reviewed as part of the supply scope.

What is needed to review a line upgrade?

Current machine details, cable range, reel sizes, available space and the problem you want to solve.

Can a building-wire line later produce multi-core power cable?

Only after reviewing the new cable construction. Cabling, fillers, tapes, larger assemblies and reel handling may add separate machines or exceed the existing extrusion scope. Compare the planned upgrade against the original configuration before purchase.

Can copper and aluminium conductors use the same route?

The required operations can be similar, but material compatibility and conductor preparation must be confirmed for each selected machine. Provide the actual conductor material, construction and size range; do not infer compatibility from a cable application name.